Get In Touch

Wrasse climbing gourami amur pike Arctic char, steelhead sprat sea lamprey grunion. Walleye

Contacts
Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA

Olette Tailings Facility – Technical Studies & Compliance (France)

Project Overview

Rio Tinto Closure (RTC) manages a portfolio of nearly 40 legacy sites across France, including the Olette tailings storage facility located in the southwest of the country.

RTC is responsible for ensuring the long-term integrity, monitoring, and safe management of the facility, with a focus on preventing and mitigating potential geotechnical and environmental risks.

As part of its commitment to comply with the Global Industry Standard on Tailings Management (GISTM), as well as internal standards D3 (Geotechnical Risk Management) and D5 (Tailings and Water Storage Facilities Management), Rio Tinto commissioned Mecater to carry out the necessary technical studies and develop comprehensive management plans to bring the Olette site into full compliance.

Key Data

  • Surface area: 6.8 ha 
  • Storage capacity: 1 million m³ 
  • Tailings type: Flotation waste 
  • Embankment height: 15 to 18 m 
  • Status: Closed and rehabilitated 

Scope of Services – Mecater

Mecater delivered a full suite of technical studies and operational tools, including:

  • Site fact sheet and data consolidation 
  • 3D modeling of the facility 
  • Dam safety assessment 
  • Design criteria report 
  • Liquefaction, stability, and deformation analyses 
  • Water management studies 
  • Identification of credible failure scenarios and failure mode characteristics 
  • Dam break analysis 
  • Trigger Action Response Plan (TARP) 
  • Monitoring and instrumentation plan 
  • Emergency Preparedness and Response Plan (EPRP) 
  • Operation, Maintenance and Surveillance (OMS) manual 
  • Corrective actions and remediation plan 
  • Potential Failure Mode Analysis (PFMA) 
  • Climate Change Resilience Assessment (CCRA) 
  • Hybrid Risk Assessment (HBRA) 
  • Site inspection sheet
since 1980
Completed
projects
0 +

ProjectsSuccessfully completed
projects for our clients
More projects

Completed
projects
0 +

ContactsConnect with your mining and tailings engineering partner

Address

44 Platon Street, Iolite Building, Kheireddine Industrial Zone
2060 La Goulette, Tunis, Tunisia

Follow us
since 1980

Information Request

Speak with an expert
Consent